Hi-Desert Water District, Wastewater Reclamation Facility

Wastewater Treatment

Contract Amount: $30,003,509

Project Completion: September 2019

HI Desert 2
HI Desert 3

Hi-Desert Water District, Wastewater Reclamation Facility

Yucca Valley, California

The Hi-Desert Water District Wastewater Reclamation Facility (WRF) was a progressive design-build project that delivered an initial capacity of 1.65 MGD expandable to a 2.6 MGD MBR WWTP. W. M. Lyles Co. was the design-builder and Kennedy Jenks Consultants was the Design Engineer. Preliminary design work began in 2016 with construction starting in January 2018. The Water District had developed a plan to implement a sewer collection system and Water Reclamation Facility in response to the Regional Water Quality Control Board’s resolution prohibiting septic tank discharges in the Town of Yucca Valley. The WRF consists of a greenfield WWTP with influent pump station, equalization basin, MBR structure, blower/pump room, electrical building, maintenance building, operations building, odor control facility, solids holding tank, solids dewatering building, percolation ponds, chemical building, UV facility, stormwater pump station, and effluent pump station.

Owner:

Hi-Desert Water District

55439 29 Palms Highway

Yucca Valley, CA 92284

Owner Contact:

Ed Muzik

Design Engineer:

Kennedy Jenks Consultants

9665 Granite Ridge Drive, Suite 210

San Diego, CA 92123

Engineer Contact:

Pat Huston

W.M. Lyles Co. PM:

Bryan Case