Pulte 1
Pulte 1

Pulte Homes, Site Utilities for Solera Development Phases 1 through 9

Underground Utilities

Pulte 2
Pulte 3
Pulte 4
Pulte 5

Contract Amount: $12,368,855

Project Completion: April, 2005

Pulte 6
Pulte 7

Pulte Homes, Site Utilities for Solera Development Phases 1 through 9

Bakersfield, California

W. M. Lyles Co. was the prime contractor responsible for the installation of over 35 miles of underground utilities on this 600 unit, multi-phased residential development. Facilities installed included 10.2 miles of 4″-12″ PVC sewer pipelines and structures, 10.3 miles of 6″-36″ PVC and DIP water pipelines and appurtenances, 5.3 miles of 18″-60″ PVC and RCP storm drain pipelines and structures, several concrete storm drain box culverts and v-gutters, and 10.1 miles of electrical, gas and communication joint trench and associated substructures. Due to the owner’s highly accelerated project schedule, some of the work occurred during the occupancy of previously completed phases which required special scheduling and logistics to minimize impacts to residents.

Owner:

Pulte Homes

271010 Puerta Real, Suite 300

Mission Viejo, CA 92691

Owner Contact:

Shawn Nelson

Design Engineer

McIntosh & Associates

2001 Wheelan Court

Bakersfield, CA 93309

W.M. Lyles Co. PM

Jeff Mathiowetz