SMWD 1
SMWD 1

Santa Margarita Water District, Lake Mission Viejo Advanced Purified Water Treatment Facility

Water Treatment

Contract Amount: $4,286,259

Project Completion: September 2017

SMWD 2

Design Engineer:

Kennedy Jenks Consultants

3210 El Camino Real, Suite 150

Irvine, CA 92602

Engineer Contact:

Steve Diamond

Santa Margarita Water District, Advanced Purified Water Treatment Facility

Mission Viejo, California

This fast paced Design-Build project was implemented by Santa Margarita Water District (SMWD) in order to swap the existing feed for Lake Mission Viejo from potable water to Advanced Purified Water. This project will filter recycled water through reverse osmosis (RO) and ultrafiltration (UF) to produce an Advanced Purified Water source that meets the District’s high quality water standards. Upon completion, the District is now able to successfully fill Lake Mission Viejo with Advanced Purified Water while saving approximately 114 million gallons of drinking water per year. This project provided SMWD with a solution to beat California’s water shortage with sustainable resources backed by the experience and performance of W. M. Lyles Co.

Owner:

Santa Margarita Water District

26111 Antonio Parkway

Rancho Santa Margarita, CA 92688

Owner Contact:

Tricia Butler

W.M. Lyles Co. PM:

Matt Cain