“The City of Stockton $190M Progressive Design-Build 55 MGD Regional Waste Control Facility Modifications Project experienced significant budget challenges during Phase 1-Design and Pre-Construction Services. The AECOM-Lyles team has shown an exceptional degree of collaboration and innovation partnering with the City of Stockton to overcome these challenges even altering the lump sum contractual approach to a GMP with contingency sharing to achieve a mutually acceptable budget and schedule path to advance the project, experiencing meaningful cooperative dialogue between the Owner and Design-Builder, and exhibiting a “project first” mentality.”