Victor Valley Wastewater Reclamation Authority, Subregional Water Reclamation Plants Project
Wastewater Treatment
Contract Amount: $67,813,355
Project Completion: February 2018
Victor Valley Wastewater Reclamation Authority, Subregional Water Reclamation Plants Project
Hesperia and Apple Valley, California
The VVWRA Subregional Plants Project includes two individual 1 MGD scalping water reclamation plants (WRP), one located in the City of Hesperia and the other in the Town of Apple Valley. They treat a portion of the local wastewater, while all solids and the balance of the wastewater continues to the main treatment plant in Victorville. This scalping design provides needed reclaimed water to local agencies as well as reduce the impact of the wastewater flows on the existing pipeline system. The two facilities include odor control filters, storm water pump stations, reclaimed water pump stations, influent fine screens, two aeration basins, inline UV disinfection, Anaergia MBR including permeate and backwash pumping, RAS and WAS pumping station, percolation ponds, distribution piping, paving, and elaborate site fencing. In addition to the WRP sites there is also a Hesperia Lift Station site with a 40 foot deep pump station, odor control filter, masonry electrical building and associated site piping, paving, and fencing. In all, there are four (4) project site locations and 5 miles of pipeline traveling through the streets of Hesperia and the Town of Apple Valley.
Owner:
Victor Valley Wastewater Reclamation Authority
20111 Shay Road, Victorville, CA 92394
Design Engineer:
Carollo Engineers, Inc.
4600 E. Washington St., Phoenix, AZ 85034
Owner Contact:
Alton Anderson
Engineer Contact:
Andrew Gillmore
W.M. Lyles Co. PM
Grant Gourley