Orange County Sanitation District, Sludge Dewatering & Odor Control at Plant No. 1
This Project constructs a new thickening and dewatering building and odor control system to replace the existing sludge handling systems for the 100MGD Plant. The construction includes 14,000cy of concrete, 32,000sf of elevated deck shoring, 570 CIDH piles, approx. 85,000lf of piping, multiple story structural steel, architectural, mechanical, fire control, plumbing, electrical and instrumentation and control systems for the new thickening and dewatering building, odor control system, two new tunnels, valve vault, and a screen wall as well as rehabilitation of exiting silos and truck load-out facilities. Over $4Million of VE ideas were accepted by the client.