Berrenda Mesa Water District, Domestic Water Pipeline Replacement
Extensive Design-Build Ethanol Production Plant with a 40 MGY capacity. First major plant for the state of California with complete design and construction responsibility. Complete plant construction including site utilities, structural concrete, tanks and equipment, infrastructure, and complete fabrication shop onsite to produce and coordinate all pipe operations.